The site
Clearview Farms is a 310-unit community in Scottsville, NY with a mix of apartments and townhomes. Homes have private entrances, with one-, two-, and three-bedroom layouts.
We installed 26 EV chargers across three separate locations.
The challenge
The simplest option for us would have been to put all 26 chargers in one central area, bringing infrastructure to just that one location. But this property is spread across three separate residential areas, and the owner didn’t want residents having to cross the community to reach a central charging site.
He wanted charging closer to each section of homes.
How we solved it
That meant bringing infrastructure to three separate areas instead of one, at a higher cost to us. We worked with the owner on that approach because convenience for residents was part of what the project needed to deliver.
The layout followed the way people live at the property, rather than asking everyone to work around a single charging location.
This is what we do. Poweral carries the work from the owner’s priorities through to the details on site, so the site just works.
Originally shared on LinkedIn as part of The Current, Week 18. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.